House foundations in Bulgaria

House foundations in Bulgaria carry everything above.

Mistakes here cost dearly. Digging, formwork, steel and concrete.

The steps

By the structural engineer’s plan.

  • Soil survey

    If needed.

  • Digging

    By machine, to the right depth.

  • Formwork and rebar

    Shape and steel.

  • Concrete

    Poured and compacted.

  • Waterproofing

    Protection from damp.

Good to know

The foundation type depends on the soil. The engineer decides.

Concrete needs time to gain strength.

Damp is the enemy. Ask about waterproofing.

Walls next? See shell construction.

Foundation questions

How long does it take?

Often a few weeks. It depends on the site.

Are plans needed?

Yes, for a new building.

Retaining walls too?

Some firms do them. Mention it.

What does it cost?

It depends on size. See costs.

Starting to build?

Tell us the size of the house. The firms send quotes.